gamemania

Tuniq Tower 120 Extreme review - Installation
PDF Print E-mail
Saturday, 19 September 2009 10:49
User Rating: / 0
PoorBest 
Article Index
Tuniq Tower 120 Extreme review
Features and specifications
Packaging
Closer look
Installation
Testing
Results and conclusion
All Pages
Installation is very easy and the manual very nice. First of all we have to place the four screws at the packplate and secure them with the four nuts.

 

 

After this we place the rubber washers.

 

Then we position the backplate.

 

Tuniq Tower 120 Extreme is secured with four spring loaded thumb screws, we tighten them and Tuniq Tower 120 Extreme is ready!

Tuniq Tower 120 Extreme

 

Here is how it looks installed.

Tuniq Tower 120 Extreme

 

From another point of view.

Tuniq Tower 120 Extreme

 

Nothing is touching at the MB heatsinks and there is plenty of room!

Tuniq Tower 120 Extreme

 

Now we can move at the most important part...Testing!



Last Updated on Monday, 26 April 2010 20:07
 

Editor's Picks

  • Noctua NH-D14 Noctua which is well known for the performance,quality and low noise of its products has released the new NH-D14 cpu cooler... Review
  • Spakle Calibre X265 Calibre series focus on two things, high performance and nice aesthetics. ... Review
  • GlacialPower GP-AX950AA The new high end power supply from GlacialPower that can deliver up to 950 watts of power and is also 80 plus Silver certified ... Review